Land to be acquired within the stretch of land design chainage 205.000 Km. to 167.200 Km. Vadodara – Mumbai Expressway in the State Gujarat
No: 2257 Dated: Sep, 15 2016
Land to be acquired within the stretch of land design chainage 205.000 Km. to 167.200 Km. Vadodara – Mumbai Expressway in the State Gujarat