Gazette Notification - Road Transport and Highways, India
Notifying that there shall be levied and collected fees on mechanical vehicles for the use of Nellore Bypass section from km 178.200 to km 161.034 (New chainage km 1366.547 to km 1383.713) on the National Highway No. 5 in the State of Andhra Pradesh: Section 7 of the National Highways Act, 1956
The Central Govt. has entrusted the stretch from kilometer 164.750 to kilometer 180.820 (Nellore Bypass section) and 52.800 to kilometer 164.750 (Tamil Nadu Andhra Pradesh Border to Vijayawada section) of NH No. 5 in the State of Andhra Pradesh respectively to the National Highways Authority of India (hereinafter referred to... Full Document
Rescinding the notification number S.O 1698(E) dated 16.07.2008 as the collection of user fee would not be viable as the monthly revenue through user fee collection would be less than monthly expenditure for collection of user fee-Bridge across Sharavathi River at km 198.000 of NH-17 in the State of Karnataka: Section 7 of the National Highways Act, 1956
The Central Govt. hereby rescinds the notification number S.O 1698(E) dated 16.07.2008 as the collection of user fee would not be viable as the monthly revenue through user fee collection would be less than monthly expenditure for collection of user fee. Full Document
Land to be acquired with or without structures, falling within the stretch of land from Km. 42.700 to Km. 44.800 (Gurgaon-Kotputli-Jaipur section) of the NH No. 8 in the State of Haryana: National Highways Act, 1956
Land to be acquired with or without structures, falling within the stretch of land from Km. 42.700 to Km. 44.800 (Gurgaon-Kotputli-Jaipur section) of the NH No. 8 in the State of Haryana. Full Document
The Central Govt. has entrusted the stretch from kilometer 164.750 to kilometer 180.820 (Nellore Bypass section) and 52.800 to kilometer 164.750 (Tamil Nadu Andhra Pradesh Border to Vijayawada section) of NH No. 5 in the State of Andhra Pradesh respectively to the National Highways Authority of India (hereinafter referred to as the Authority.
The Central Govt. has entrusted the stretch from kilometer 164.750 to kilometer 180.820 (Nellore Bypass section) and 52.800 to kilometer 164.750 (Tamil Nadu Andhra Pradesh Border to Vijayawada section) of NH No. 5 in the State of Andhra Pradesh respectively to the National Highways Authority of India (hereinafter referred to... Full Document
The Central Govt. hereby rescinds the notification number S.O 1698(E) dated 16.07.2008 as the collection of user fee would not be viable as the monthly revenue through user fee collection would be less than monthly expenditure for collection of user fee:National Highways Act, 1956
The Central Govt. hereby rescinds the notification number S.O 1698(E) dated 16.07.2008 as the collection of user fee would not be viable as the monthly revenue through user fee collection would be less than monthly expenditure for collection of user fee. Full Document
Entrusting the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority:Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
The Central Govt. entrusted the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority. Full Document
Entrusting NH No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority: section 11 of the National Highways Authority of India Act, 1988
The Central Govt. has entrusted NH No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26... Full Document
Entrusting National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority: section 11 of the National Highways Authority of India Act, 1988
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
Entrusting National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority: section 11 of the National Highways Authority of India Act, 1988
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
Entrusting the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority: National Highways Fee (Determination of Rates and Collection) Rules, 2008
The Central Govt. entrusted the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority. Full Document
Notifying that there shall be levied and collected fees on mechanical vehicles for the use of two lane with paved shoulder Saoner- Chhindwara including part of Chhindwara Ring Road section from kilometer 0.000 to kilometer 75.460 of NH 547 (Old NH-26B) in the State of Madhya Pradesh & Maharashtra: National Highways Fee (Determination of Rates and Collection) Rules, 2008
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
Notifying that there shall be levied and collected fees on mechanical vehicles for the use of 2- lane with paved shoulder Chhindwara-Amarwara including part of Chhindwara Ring Road section from kilometer 23.590 to kilometer 57.070 (Ring Road)& from kilometer 97.455 to kilometer 140.00 of NH 547 (Old NH-26B) in the State of Madhya Pradesh: National Highways Fee (Determination of Rates and Collection) Rules, 2008
The Central Govt. has entrusted NH No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26... Full Document
Notifying that there shall be levied and collected fees on mechanical vehicles for the use of 2-lane with paved shoulderChhindwara (from Ring Road)-Seoni section from km 91.066 to km 152.351: National Highways Fee (Determination of Rates and Collection) Rules, 2008
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
Amendments in the Notification of the Govt. of India, Ministry of Finance (Department of Revenue), No. 09-2015-Customs (N.T.), dated the 15th January, 2015.
The Central Board of Excise and Customs, hereby makes the following amendments in the Notification of the Govt. of India, Ministry of Finance (Department of Revenue), No. 09-2015-Customs (N.T.), dated the 15th January, 2015. Full Document
The Central Govt. entrusted the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority.
The Central Govt. entrusted the stretch from kilometer 0.000 to kilometer 46.300 of Hajipur-Muzaffarpur section of NH No. 77 in the State of Bihar to the National Highways Authority of India hereinafter referred to as the Authority. Full Document
The Central Govt. has entrusted NH No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority.
The Central Govt. has entrusted NH No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26... Full Document
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority.
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No. 26 connecting Harrari, Amarwada, Chhindwara, Sausar in the state of Madhya Pradesh) to the National Highways Authority of India hereinafter referred to as the Authority.
The Central Govt. has entrusted National Highway No. 69A (starting from Multai on existing NH No. 69 connecting Chikhli, Dunawa, Chhindwara, Chaurai and terminating at Seoni on NH No. 7 in the State of Madhya Pradesh) and NH No. 26B (the highway starting from Narsinghpur on the existing NH No.... Full Document
Land to be acquired, with or without structure, falling within the stretches of land from Km. 29.400 to Km. 46.600 (New Chainage) (Ludhiana-Chandigarh Section) of the NH No. 21 and 95 (New NH No. 5) in the State of Punjab: Section 3A of the National Highways Act.1956
Land to be acquired, with or without structure, falling within the stretches of land from Km. 29.400 to Km. 46.600 (New Chainage) (Ludhiana-Chandigarh Section) of the NH No. 21 and 95 (New NH No. 5) in the State of Punjab. Full Document
Land to be acquired, with or without structure, falling within the stretches of land from Km. 29.400 to Km. 46.600 (New Chainage) (Ludhiana-Chandigarh Section) of the NH No. 21 and 95 (New NH No. 5) in the State of Punjab: Section 3A of the National Highways Act.1956
Land to be acquired, with or without structure, falling within the stretches of land from Km. 29.400 to Km. 46.600 (New Chainage) (Ludhiana-Chandigarh Section) of the NH No. 21 and 95 (New NH No. 5) in the State of Punjab Full Document