Recovery of additional cost for completing the left-over balance work at risk and cost of the Contractor leaving the work incomplete.
No: एफ -53/2/2013/19/यो/3086 Dated: May, 10 2013
Recovery of additional cost for completing the left-over balance work at risk and cost of the Contractor leaving the work incomplete.
छोड़े गए कार्य को ठेकेदार की जोखिम एवं लागत पर पूर्ण कराने पर आई/आने वाली अतिरिक्त लागत की वसूली बावत्